POOL PLUMBING
GETTING THE POOL PLUMBING RIGHT FROM THE BEGINNING IS THE MOST IMPORTANT PART OF ORGANISING A BUILD. MISSING SOMETHING AT THIS STAGE WILL PROVE VERY DIFFICULT TO RECTIFY AFTER CONCRETING. THIS INCLUDES ALL PROVISIONS FOR SOLAR AND PRESSURE CLEANERS AS WELL AS CONSIDERATION FOR INFLOOR CLEANERS ETC.

THE CORRECT INFROMATION PRIOR TO CONSTRUCTION CAN SAVE A LOT OF HEADACHES. ALL SEASONS SOLAR CAN PROIVDE THE CORRECT INFORMATION.
CALL US NOW
STAGE 1 : PRE-PLUMB
This happens at the steel stage BEFORE concrete. At this time we install the Skimmer, pool returns (usually 2), Pressure Cleaner provision and Solar provisions (both suction and return). Light housings are also installed during this stage.

Any infloor cleaning systems need to be installed PRIOR to steel being placed in pool.
STAGE 2 : PIPE RUN
This usually happens after pre-plumb but can happen at the same time depending on what the building/design of the pool entails. All that happens here is the pipes are picked up from the pool shell and extended back to the filter location. They are then stood up in their correct location to allow for installation of equipment.
STAGE 3 : EQUIPMENT SUPPLY AND INSTALLATION
This is generally the most expensive stage as you need to purchase the filtration equipment and install it! I will recomend and advise you regarding your needs for pool filtration equipment. Generally this stage is as simple as the title sounds, install the equipment!
POOL PARTS & EQUIPMENTS
ALL SEASONS SOLAR CAN SUPPLY AND INSTALL ANY POOL EQUIPMENT THAT YOU REQUIRE FILTERS,PUMPS,CHLORINATORS,CLEANERS AND GENERAL POOL EQUIPMENT CAN BE QUOTED TO SUPPLY ONLY OR SUPPLY AND INSTALL.PLEASE CONTACT US FOR ADVICE AND OR A FREE QUOTE
POOL FILTERS
POOL PUMPS
CHLORINATORS
As with any of the heating options mentioned above, the addition of a Pool Blanket will also reduce the running costs associated with any form of heating. There are a few shortcomings with pool blankets also, as well as some standout benefits,you just need to trade them all off!